Full & partial rewires
New circuits, back boxes, earthing and bonding, accessories and making good. Partial rewires are staged room by room so the house stays liveable throughout.
Pine Crest & the Ridge · Domestic and small commercial
We survey the board, write the scope, agree the power-off window with you, then test and certify. No work starts on a verbal guess, and nothing gets opened up without you knowing what it costs.
If the power is off right now
Half the callouts we take are solved in two minutes by the person already standing in the house. Work through these first — if the power stays off, note what you found and send it with your enquiry.
Look at a neighbour’s lights or the street lighting. A whole-street outage is a network fault and no electrician can restore it — it is your supplier’s job.
Open the consumer unit cover and look for a single switch sitting out of line. Note the label next to it. That label tells us which circuit is faulty before we arrive.
Unplug everything on the dead circuit, reset the switch once, and plug items back one at a time. If it trips again on the same appliance, the appliance is the fault, not the wiring.
What we take on
Each lane below lists what is actually included and roughly how long the property is affected. If your job spans two lanes, we quote them as one scope so there is no second mobilisation charge.
New circuits, back boxes, earthing and bonding, accessories and making good. Partial rewires are staged room by room so the house stays liveable throughout.
Replacement board with individual RCBO protection, surge protection where the supply allows, full circuit testing and a labelled schedule of every way.
Load assessment on the existing supply first, then a dedicated protected circuit, cable route agreed with you, and commissioning with the unit’s own app.
Tracing nuisance trips, dead circuits, buzzing switches and damp-related faults. Diagnosis is charged by the hour and quoted separately from any repair.
Layouts drawn to how the room is used, dimmable circuits grouped sensibly, outdoor and garden runs in armoured cable with weatherproof terminations.
Periodic inspection with a written report, coded observations explained in plain language, and a clear split between what must be fixed and what can wait.
How a job runs
Electrical work goes wrong when the scope moves halfway through. This sequence exists so that nothing is opened, chased or isolated before you have seen it in writing.
We open the board, test the incoming supply, check earthing and bonding, and look at the loft and under-floor routes. Around an hour, and it belongs to you whether or not you book.
A line-by-line list of circuits, accessories and making good, with the price held for thirty days. Anything optional is listed separately so you can take it out.
We agree in advance which days the power is off and for how long. Fridges, home working and medical equipment are planned around before the first cable is pulled.
Full testing, a labelled schedule of circuits, certificates issued, and photographs of anything now hidden behind plaster or under boards.
Before we quote
These are the details we look for on the survey. Knowing them helps you compare quotes properly — if another quote is much cheaper, it usually means one of these was not checked.
Field notes
Written up the week they finished, including the parts that were harder than expected.
Ridgeway · Terraced house
The customer wanted a modern consumer unit. Testing before we started found a borrowed neutral between the upstairs lighting and the landing circuit — invisible until each circuit gets its own protection. We fixed the neutral, re-terminated two junction boxes buried above the ceiling, and only then fitted the board. The extra work was quoted and approved on the day, because replacing the board without it would have caused constant tripping that looked like a faulty new unit.
Halton Fields · Kitchen extension
The original layout put nine downlights on one switch. We split it into three circuits — worktop, table and general — so the room can be dim without being dark in the wrong places. Dimming modules were chosen to match the lamps rather than the other way round, which avoided the flickering that usually follows a retrofit.
Questions we are asked weekly
Age alone is not the test. A board with rewireable fuses or a single trip covering the whole house is worth replacing because one fault takes out everything. A board that is twenty years old but has individual protection and passes testing can stay. We test first and tell you which of the two you have.
Yes, and most of ours are. We work floor by floor or room by room, leaving each finished section energised and certified before opening the next. It costs a little more overall because of the repeated set-up, but it avoids moving out and it spreads the payments.
For a consumer unit change, four to six hours in one block. For a staged rewire, typically two to four hours per section rather than whole days. We agree the window before the job and keep at least one socket circuit live wherever the existing wiring allows.
Usually, but it depends on the main fuse and what else draws heavily — an electric shower, a heat pump, an induction hob. We measure the existing demand rather than guess. Where the supply is tight, a load-limiting charger often solves it without an upgrade to the incoming supply.
Bring it to the survey. We go through each observation and separate the items that are genuinely unsafe from those that are simply not to current practice. You should never be asked to pay for work on the basis of a code nobody has explained to you.
Every job ends with a certificate listing the circuits, the test results and the person who carried out the work. For notifiable work you should also receive confirmation that it has been registered with building control. If a quote does not mention certification, ask why before you accept it.
Request a quote
Send the basics and we will reply with either a survey slot or, for small jobs, a price straight away. There is no charge for the survey and no obligation after it.